Patch cement floor before tiling. I cut the membrane to extend at least two tile widths on both sides of the crack. Answer answer generally speaking allowing the concrete to cure for 28 days allows it to achieve 90 cure and there is no significant shrinkage in the concrete after that in terms of installing ceramic tile over it. Tile flooring can quickly give an old floor pizazz. And at only 0 8 mm thick the membrane can be used under almost any tile floor.
Covers up to. Skip this step and we guarantee your new tile will crack right over the cracks in the concrete. The membrane which is bonded to the slab with the same latex modified thinset that i use for installing the tile absorbs any additional movement in the concrete. Once you ve prepared the concrete floor you ll be ready to lay a tile floor and create your ideal design.
Then prime the concrete see photo 2 with the recommended solution consult the membrane manufacturer s literature. Before tiling the floor level any raised patches with a handheld concrete grinder. The floor patch helps fill minor dips and imperfections. While laying tile is.
Cleaning and filling any cracks in the floor takes a little time and the only precautions to take prior to tiling are to make sure that the floor is completely dry as the thinset used for tile needs a moisture free environment. Patching and sealing a concrete floor takes extra time and effort but these essential steps ensure that the surface will support the tile for years to come. How to lay tile over cracked concrete. You need to rely on the manufacturers data sheet recommendations for the thin set dry set mortar you are using to adhere to the concrete.
Concrete subfloors move shift and crack over time. Grind slowly and carefully if you remove too much concrete you ll create another hole to patch. Repairs holes and cracks. Cut the membrane so it s 1 1 2 times the width of your tiles.
Let the primer dry and then apply the membrane photos 3 and 4. To prevent that movement from creating cracks in your grout and tile install a crack prevention membrane after the concrete subfloor is clean flat and free. The following steps will allow you to prepare a concrete floor before you lay your tiles. If there are cracks larger than 1 8 inch in your concrete subfloor those should be patched and filled with a cement patching compound.